34
Glazing (part 1)
Diagram 83
With the large pane in position you can now install
the first piece of bar capping. This capping is fitted
to the glazing bar with 40mm Pan head screws and
should be as far down the glazing bar as possible,
touching the mid rail. This will leave a gap at the
top, as shown in diagram 84.
12
Before you install the large panes it helps to place each bar capping around the building ready for
installation. When ready, insert the large side pane next to the louvre (diagram 82). If this is difficult
try loosening off the middle screws on the eaves bracket indicated by the arrows on diagram 84.
Remember to tighten all the screws after glazing the sides, but don’t over tighten them!
795mm x 1050mm
EV795X1050
Dia. 83
Diagram 82
External
Diagram 84
Dia. 84
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...