35
Glazing (part 1)
12
Work around the building fitting the next pane along
followed by a section of capping.
The capping either side of the door and in the middle
at the rear of the building is slightly different to the
standard capping. If you have aluminium capping this
also needs rubber inserting along the channels. It is
installed with 40mm Pan head screws.
Diagram 85
Glazing
Rubber
Diagram 87
Diagram 86
EV0991M
Section
Section
EV0981
CEDAR CAPPING
ALUMINIUM
CAPPING
400m
m x 1050m
m
EV400X1050
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...