52
Staging Installation
18
You can now start to install the staging slats. Each slat needs 4 x 10mm bolt (HE576) sliding down
the bolt channel on the underside. Its easiest to lay the slat topside down to do this, then turn it over
to position it. The two bolts closest to the ends locate with the holes in the staging arms (diagram
136). The longest slat (EV1111M) nearest to the middle of the greenhouse needs 5 x 10mm bolts.
Diagram 135
Diagram 136
Dia. 136
The ends of the slats should line up with
the staging arm, if they don’t then this
suggests the building is out of square. Try
adjusting the position of the base until the
slats line up.
EV1114M
EV1114M
EV1114M
EV1113M
EV1112M
EV1111M
Diagram 137
Internal
Internal
Internal
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...