59
High Level Shelf Installation
19
You now need to assemble the internal shelving arms (EV1128M) with the tubular supports
(EV0348M). You need to create one left hand assembly and one right hand assembly (diagrams 154
& 155).
Now offer each assembly to the shelving slats and slot them on to the bolts already inserted. Line up
with the front edge and at the rear with the outer shelving arm, attach nuts and fix when you’re
happy with the position. Check the shelf is level before fixing the tubular supports to the
greenhouse frame (diagram 156).
EV
0348
M
EV11
28M
Diagram 154
Diagram 156
Diagram 155
EV1128
M
EV
03
48
M
Left hand assembly
Right hand assembly
Internal
Summary of Contents for Evolution Octagonal 9x6
Page 1: ...1 04 19...