14
Side Assembly
Now slot the three 4’ mid rails (EV0957) into position.
Drill a pilot hole through the inside face of each of the
(EV0970) glazing bars central to the mid rail and fix
with a 50mm countersunk screws (diagram 26).
The mid rail brackets (EV0999M) can be fitted with
40mm Pan head screws, note that the screw positions
on the mid rail brackets are different in diagram 27
(left hand) and 28 (right hand). This is to leave space
for the staging brackets.
There is also an order to inserting the screws, follow
the order on the diagrams as it makes installing them a
little easier. 1 and 2 go into a fixed mid rail that was
part of a 2’ side frame, 3 and 4 go into the loose end of
the mid rail and 5 always picks up the loose mid rail
through the tenon.
Diagram 25
Dia. 26
4
Dia. 27
Internal
Dia. 28
EV0957
Top View
Doorway
Dia. 27
Dia. 26
Dia. 26
Dia. 28
Dia. 27
Dia. 28
Dia. 27 Dia. 26 Dia. 28
Summary of Contents for Evolution octagonal
Page 1: ...1 04 19...