21
Roof Assembly
8
Diagram 44
Internal
36
m
m
Diagram 45
Diagram 46
X-ray
External
With help position the lower roof frame
assembly onto the building (diagram
43).
See diagrams 44 and 45 for the fixing
down of the roof bars to the sides
making sure they are pulled tight into
the side glazing bars leaving no gap.
When in position drill vertically down in
the location shown in diagrams 45 and
46. Then fix with a 80mm CSK screw.
Work your way around the building
until all roof bars are fixed.
80mm Scre
w
Diagram 43
EV
0
96
6
EV
09
66
X 8
X 8
Summary of Contents for Evolution octagonal
Page 1: ...1 04 19...