D729TG
525mm x 100mm
Glazing (part 2)
14
Work around the building securing the glass
with the bar capping using 40mm pan head
screws.
When you get to the glazing bars in the middle
of a 4’ section as before with the sides these
use a slightly different capping (diagram 118
& 119).
If you haven’t already done so you can now
install the louvre glass, 6 per louvre. From the
inside of the building carefully slide each piece
(525 x 100mm - D729TG) into the louvre
frames glass retainers until it hits the small
stop either side.
Diagram 118
Section
EV0983
CEDAR CAPPING
Diagram 119
Glazing
Rubber
EV0993M
Section
ALUMINIUM
CAPPING
Diagram 120
External
Summary of Contents for Evolution octagonal