59
High Level Shelf Installation
16
You now need to assemble the internal shelving arms (EV1128M) with the tubular supports
(EV0348M). You need to create one left hand assembly and one right hand assembly (diagrams 153 &
154).
Now offer each assembly to the shelving slats and slot them on to the bolts already inserted. Line up
with the front edge and at the rear with the outer shelving arm, attach nuts and fix when you’re
happy with the position.
EV
0348
M
EV11
28M
Diagram 153
Diagram 155
Diagram 154
EV1128
M
EV
03
48
M
Left hand assembly
Right hand assembly
Internal
Check the shelf is level before fixing the tubular supports to the greenhouse frame using three 25mm
pan heads EV0326 (diagram 155).
Summary of Contents for Evolution octagonal
Page 1: ...1 04 19...