24
Glazing Bar
Capping
610 x 1635
Glazing
9
Slide the
glass into the
rebate of the
eaves bar and
rest it on the
aluminium
base as
above.
Side Cill
Glazing Bar
Side Base
Glass
Glass Size
66
68
610
612
A
2 2 2 4
B
1 1 1 1
C
1 1 1 1
610x1635
7 8 8 9
610x1520
3 4 5 6
610x868
1 1 2 2
610x153
1 1 2 2
525x100
6 6 12 12
610x610
1 1 2 2
610x642
2 3 3 4
558x997
1 1 1 1
D
2 2 2 2
64
2
1
1
2
6
2
1
1
6
1
1
1
There are 2 types of capping available on this range of
greenhouses. The standard cedar capping or the
upgrade aluminium capping.
If you have the Aluminium capping you need to slide
the glazing rubber into channels on the back of the
capping. Use a Stanley knife or scissors to cut to
length, it is best to use a complete length per side.
If you have the cedar capping you need to pre load
each strip with the 25mm screws. Also before you
install each pane you need to run a thin bead of silicon
up each glazing bar (no greater than 5mm is needed).
All of the capping is pre-cut to length, so sort through it
placing the capping around the building close to were
you can reach it. Start by glazing the first side section.
Make sure you have the first piece of capping to hand.
Glazing Rubber
Silicone