51
Gutter and Downpipe Installation
12
Diagram 67
Diagram 68
25mm Screw
With help position your gutter
on the side face of the eaves
bars, this should be the same
length as the eaves bar and fit
between the ends of the roof
corner bars. Fix it in place with
25mm screws, diagram 67.
Fit the plastic pipe insert in the end of
the gutter you want your down pipe to
run out of (diagram 68). Use a small
amount of silicone to seal this in place.
Go to the next page to see how the
downpipe can be installed.
D201
External
Gutter Parts
Part Name
Part
Number
Qty
Gutter:
2
6ft long
EV0621M
8ft long
EV0622M
10ft long
EV0623M
12ft long
EV0624M
Bracket
EV0740M 4
Stop end RH
EV0535M 2
Stop end LH
EV0536M 2
Downpipe Outlet
D201 2
Downpipe Shoe
D207 6
Rubber Blank
D214 2
Summary of Contents for VICTORIAN OAKHAM
Page 1: ...12 15...
Page 57: ...57 Finished installation 15...