To start building your greenhouse begin by laying out the components for your sides flat on the
ground like the diagram below. Use the tables below to identify your building length and the
components with the part numbers and sizes. First of all drill pilot holes through the bottom of each
mortise on the cill section (diagram 2, page 9). Then slot each glazing bar into the mortise holes.
These are designed as a tight fit so you may need help with this or maybe use a solid object to push
against. Once firmly in position fix with the 50mm screw. Now slot the eaves rail into position (e.g.
EV0420). There is no need to fix this yet as it is done at a later stage.
Side Assembly
2
Part
Number
Size
(mm)
Qty
EV0015 1846 2
EV0418 1934 2
EV0489 1588 4
6ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0016 2476 2
EV0419 2564 2
EV0489 1588 6
8ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0017 3106 2
EV0420 3194 2
EV0489 1588 8
10ft long
Part Name
Cill
Eaves Bar
Glazing Bar
Part
Number
Size
(mm)
Qty
EV0018 3736 2
EV0421 3824 2
EV0489 1588 10
12ft long
Part Name
Cill
Eaves Bar
Glazing Bar
example
EV0017
EV0420
EV0489
Dia. 2
Dia. 3
EV0489
EV0489
Internal
EV0489
10ft long
example
Eave
s bar
exte
rnal
face