background image

Page 4 of 8

1

 

Measure one of the glass Door Panels [

A

] and subtract 

4 1/2”. That is the distance up from the sill that you will 

place the BOTTOM of the two Wall Mount Brackets [

B

]. 

Using a wall mount bracket as a guide, and holding it level, 

mark the hole locations on the walls, making sure that it is 

located so that the center guide can be installed properly in 

Step 5 of this instruction. Drill the four holes 3/8” diameter. 

Insert the four Wall Anchors [

C

] into the holes and attach 

the wall mount brackets with the four Wall Mount Bracket 

Screws [

D

].

 

NOTE: For an out of level sill, install the wall mount bracket 

on the high side as described, and use a level and the 

cut header bar (step 2) to locate and install the opposing 

bracket. 

 

NOTE: There are four large anchors and two smaller ones 

used to mount the center guide in Step 5 of this installation 

instruction. 

 

OPTIONAL:

 If the anchors are not used, Drill a 1/4” 

diameter clearance hole, just through the tile and a pilot 

hole into the wall stud. Install the wall mount brackets as 

described above.

2

 

Measure the distance across the opening near the top 

of where the shower door is going to be. Subtract 3/4” 

and cut the Header Bar [

E

] to that length. File down any 

burrs created by cutting the header bar. 

 

NOTE: There are spacers placed down the length of the 

header, between the two rectangular tubes. You will need 

approximately 5 inches on each end with no spacers, to 

get the Stoppers [

F

] positioned correctly. You may have to 

make two cuts.

3

 

Slide two Stoppers [

F

] over each end of the header 

bar, with the rubber bumper on the top side of the bar 

and pointing towards the middle of the header bar. Do not 

tighten the set screws at this point.

Summary of Contents for ProLine PL50

Page 1: ...INSTALLATION INSTRUCTIONS ProLine PL50 FRAMELESS SLIDING ENCLOSURE Copyright Alumax Bath Enclosures 2019 All rights reserved G031047850 3 14 19...

Page 2: ...age to the enclosure Make sure wall jamb bumpers are securely fastened in place per the installation instructions GLASS USAGE AND HANDLING WARNINGS a TEMPERED GLASS CANNOT BE CUT Attempting to cut tem...

Page 3: ...er H 8 Wall Mount Set Screw I 1 Center Guide J 2 Center Guide Insert K 2 Center Guide Screw L 8 Roller Cap M 8 Roller N 8 Roller Screw O 8 Roller Cover P 2 Bottom Seal Q 2 L Jamb R 4 Large Hole Plasti...

Page 4: ...re four large anchors and two smaller ones used to mount the center guide in Step 5 of this installation instruction OPTIONAL If the anchors are not used Drill a 1 4 diameter clearance hole just throu...

Page 5: ...e holes will help seal the holes and prevent moisture from entering the sill Place the center guide anchors into the holes Put a small bead of silicone around the interior of the outline for the cente...

Page 6: ...r door panel first It is the panel that when held has the rollers near you and the sweep leg of the bottom seal on the opposite side Lift the rollers above the bar and making sure that the bottom enga...

Page 7: ...th of the L Jamb 12Locate the four large hole plastic washers R and place them over the threads and flush with the four end caps S Next place the four Plastic Inserts T onto the four end caps and flus...

Page 8: ...L jamb on the side determined in step 10 Slide the bumper over until the rubber contacts the roller wheel Tighten the Stopper Set Screws X on the bottom until tight Move the exterior door to the oppo...

Reviews: