Assembly Instructions
•
Slide Aluminum Mounting Bracket
(7)
onto Vertical
1”
PVC Shaft
(2)
•
Run
“
Female
”
end of power
-
cord through
1”
PVC Handle Assembly and Vertical Shaft
•
Position the Light Head Assembly
(1)
below the Vertical PVC Shaft
(2)
•
Plug the Light Head Connections
(3)
into the Power
-
Cord Connection
(4)
•
Slide the Light Head Assembly
(1)
onto the Schedule 40
1”
Vertical Shaft
(2)
(Use
PVC glue or screws to secure pieces).
•
T
o
Remove or Replace FlounderPro 2850 Light Heads, loosen screws
(5)
on PVC light
head assembly.
1
2
4
3
6
™
7
2
5