Page 6
For Assistance: support@alvaradomfg.com +1 (909) 591-8431 PUD4146R1-0
EDM Installation and Maintenance Instructions
• There must be 2" (50.8mm) of clearance between the turnstile arm and the adjacent turnstile or barrier [Fig. 1].
• Stub up conduit in accordance with local electrical codes [Fig. 2].
• Always verify the layout of the turnstile(s) before anchor installation.
Fig. 2
Fig. 1
Space & Conduit Requirements
Adjacent Barrier or
Turnstile
2" [50.8]
2X 5 [127]
0
37 [940]
39.2 [997]
3.8 [95]
43 [1092]
2X 4.5 [114]
6 [152]
2X 1.1 [28]
0
2X 8.4 [213]
9.5 [241]
2X 2.3 [57]
2X 34 [864]
4X .5 [13] THRU
ANCHORING
LOCATIONS
inches [mm]
Conduit Opening
Conduit Opening