Supervisor 3500 Installation Instructions
Page 4
For assistance: support@alvaradomfg.com +1 (909) 591-8431 PUD3673R1-1
Installation Tools
•
Tape Measure
•
Chalk Line
•
Pencil
•
Hammer Drill
•
5/8" Concrete Drill Bit
•
Shop Vac
•
Hammer
•
9/16" Wrench
•
Torque Wrench (ft-lbs.)
•
Open Wrench
•
9/16" Socket
•
Level
•
#2 Phillips Head Screwdriver
•
Precision Flat Head Screwdriver
•
Clear RTV Silicone
This product is shipped with all installation hardware and components. If installing a single lane, refer to the Single Lane Parts List
below. For additional lanes, refer to the Center Cabinet Parts List. Make sure that none of these parts are missing and/or damaged
before beginning installation. If parts are missing and/or damaged, please contact Alvarado.
Center Cabinets are used to create additional lanes for multi-lane
configurations. Each additional lane includes the parts below.
Single Lane Parts List
Center Cabinet Parts List (Per Center Cabinet)
Concrete Anchor Package:
Concrete Anchor Package:
Cabling:
Cabling:
Software:
Parts List
Uncrating
•
⅜" x 2½" Hex Head Cap Screws (Qty 8)
•
⅜" x 2½" Hex Head Cap Screws (Qty 4)
•
⅜" Flat Washers (Qty 8)
•
⅜" Flat Washers (Qty 4)
•
⅜" x 2" Concrete Anchors (Qty 8)
•
⅜" x 2" Concrete Anchors (Qty 4)
•
8' Crossover Cable (Qty 1)
•
8' Crossover Cable (Qty 1)
•
File Management CD (Qty 1)
The SU3500 has been packed for shipping to prevent damage to the unit. Two or more installers are required
to unload the SU3500 at the installation site. Once the turnstile cabinets have been placed in the installation
location, carefully remove the protective packing material from the sides of the cabinets.
Master Cabinet
(Qty 1)
Center Cabinet
(Qty 1)
Slave Cabinet
(Qty 1)
Cabinet Lid
(Qty 1)
Cabinet Lid
(Qty 2)