THIN-LINE
®
SERIES 180M WELD HEADS
990-133
3-1
CHAPTER 3
OPERATING INSTRUCTIONS
Section I. Getting Started
Installation Checklists
INSTALLATION CHECKLIST FOR ALL HEADS
Check that the cables are correctly attached at both ends.
Verify that the Firing Switch Cable is attached to the welding power
supply or Control.
Set the
WELD/NO WELD
Switch, located on the front of the welding
power supply (Control), to the
NO WELD
position.
Verify that the welding power supply (Control) is connected to the
appropriate power source and that the power is switched to
ON
.
Switch the welding power supply (Control) to
ON
. Follow the
procedures in the manual to program and operate the welding power
supply (Control).
INSTALLATION CHECKLIST FOR AIR ACTUATED HEADS
Verify that the air lines are properly connected to the head and the
main air supply (448 kPa (65 psi) nominal) is turned
ON
.
Verify that the line cord from the air solenoid is connected to the
power supply (Control), if required.
Verify that the footswitch is connected to the welding power supply
(Control).
Welding Force Theory
Welding force (pressure) is a key variable in the resistance welding process. Excessive or insufficient
welding force or pressure can cause a weak weld. More information is available from Amada Miyachi
America:
A)
Resistance Welding Troubleshooting Guide
B)
Electrode/Material Selection Guide
C)
Resistance Welding Spot Welding Applications
D)
Technical Service Bulletins on a variety of subjects
Summary of Contents for THIN-LINE 180 M Series
Page 1: ...990 133 REV F WELD HEAD THINLINE 180 M SERIES OPERATION MANUAL ...
Page 34: ......
Page 38: ......
Page 42: ......