Operation
2110A PT Peanut Combine
Proper Operation
Once your combine has been put into
operation, it is important that you make the
following checks for proper operation:
If…
Then…
All peanuts are removed from the vines and
no more shelling occurs than might be
expected in a new machine
Leave the combine controls where they are
set.
More than an occasional good peanut is left
on the vines
Increase tractor RPM up to 110% or begin
engaging 1
st
overhead teeth starting at ½
engaged moving in 1” increments toward fully
engaged.
An excessive number of peanuts are not
removed from the vine.
•
Fully engage the first adjustable
overhead teeth.
•
If peanuts are still left on the vine,
begin engaging the rear overhead
adjustable teeth in 1” increments.
•
If both sets of overhead teeth are
engaged and RPM has been
increased, then begin engaging
retention board as needed.
“Tails” are being left on the peanuts
Engage the concave teeth (if equipped) in 1”
increments beginning with the front set.
There are NO leaves or other light foreign
material present in the basket or peanuts
blowing over the tailboard
Make no changes to the cleaning air setting
at this time.
Only a few hulls and LSKs are in the bin
during the first few acres of operation
Make no changes to the elevator air setting
at this time (unless the peanut hulls are very
fragile or too little air is available to blow the
peanuts to the bin).
Picking aggressiveness and available
cleaning and pneumatic conveyor air needs
to be increased or decreased
Adjust the combine speed from 90% to 110%
as needed.
NOTE!
Make only ONE operational
adjustment at a time between
performance checks. This will allow you
to determine which adjustment is
working, rather than guessing at which
adjustment made the change.
DANGER
Always
stop combine, set the parking
brake, and shut the tractor motor off
before leaving tractor for any reason.
36
12/18/15
MAN143
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...