Preparation
2110A PT Peanut Combine
Overview
Before operating the machine for the first
time, go over the section titled “Pre-Delivery
Checks” with your dealer to verify the
combine is ready for operation. Every
combine is test run at the AMADAS plant, but
a thorough pre-delivery inspection is
important, as items may have loosened
during shipping.
Chapter 3,
Operation
, contains a “Daily
Checklist.” It is important that you perform
these checks each day you intend to use your
combine. These checks are intended to help
you detect problems early, reduce downtime,
and extend the life of your combine.
Safety Strut
Read Chapter 1,
Safety
, before performing
any checks on your machine. In addition, be
aware of the safety strut that locks the bin in
the open position.
Always
use the safety
strut as intended before checking or working
around the open bin. The safety decal
located below the strut provides instructions
for using the strut.
Safety Strut
18
2/29/16
MAN143
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...