2110A PT Peanut Combine
Preparation
Pre-Delivery Checks
1. Open all shields and check chains and
belts for proper tension.
2. Check bushing bolts, set screws, and jam
nuts on all sprockets, sheaves, shafts,
etc., for tightness.
3. Torque all lug
nuts to proper
specifications (400 ft/lb for flange type lug
nuts, 475 ft/lb for Budd type lug nuts).
4. Check oil level in tongue gearbox by
removing the level plug in the side of the
gearbox. Add AGMA Grade 5 synthetic
non-foaming oil if necessary.
5. If equipped with combine hydraulics,
check the hydraulic oil level in tank
(approximately 32 gallon capacity). Level
should be above midway in sight gauge
when cold.
6. Check and lubricate all lubrication points.
7. Hitch the combine to a tractor.
8. Check hydraulic lines for leaks. (First
read “Hydraulics Warning” on page 4 in
Chapter 1,
Safety
.)
9. Lock bin in raised position with safety
strut, and check for loose bolts or
obstructions in the picking chamber.
Safety Strut
DANGER
Install the safety strut over the hydraulic
cylinder before working around or under
the raised bin. Death or serious personal
injury could result if the bin were to fall.
Tongue gearbox
MAN143
2/29/16
19
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...