Operation
2110A PT Peanut Combine
Attaching and Checking
Driveline
1. Ensure that the tractor draw bar is set
such that the center of the hitch ball is
approximately 3-½” below the centerline
of the tractor PTO output shaft. Extend
the tractor draw bar such that the center
of the hitch ball is approximately 20” from
the end of the tractor PTO output shaft
(sketch). If your combine is equipped
with a pin type hitch, use the same 20”
dimension to center the tractor clevis pin.
2. If equipped with a side shift tongue, shift
the tongue to the operating position (left
side).
3. Attach the driveline to the combine and
tractor PTO. 1-3/8” 21 spline and 1-¾”
20 spline ends are available.
IMPORTANT!
Your AMADAS 2110A
has been equipped with a constant
velocity PTO driveline. Because of the
double Cardan Joint incorporated into
this shaft, you can expect a constant
output shaft speed with minimal
vibration. The shaft speed will remain
constant with minimum vibration even in
a tight turning radius. Please read the
section on lubrication in Chapter 7,
Maintenance
, thoroughly as the PTO
drive shaft has special requirements.
DANGER
All drive shields and guards must be in
place when the combine is in operation.
Death or serious personal injury will
result from entanglement.
CAUTION
Failure to check driveline length and
clearance can cause damage to
combine and tractor.
NOTE!
A tractor draw bar extension
(AMADAS part #61359) may be required
to attain a distance of 20” between the
tractor PTO output and the hitch ball on
tractors with 1-3/8” 21 spline PTO.
28
12/18/15
MAN143
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...