2110A PT Peanut Combine
Operation
Operating Procedure
10. After making any necessary adjustments,
run the combine down the windrow the
same distance and check performance
again.
11. Set the controls as desired and continue
to the end of the row.
12. Harvest the first few bins of peanuts at
moderate speed to become accustomed
to the machine.
13. Before dumping the bin, always check for
overhead obstructions or power lines. In
very dirty conditions, dumping the bin
slowly will help produce a cleaner sample
by allowing the strainer at the bin lip to
remove more dirt and small foreign
material.
NOTE!
When combine speed monitor
reads 100%, tractor PTO should run at
approximately 790 RPM PTO when the
combine is equipped with standard
drives. If the combine speed cannot be
main/- 1% by the tractor engine,
installation of the optional RPM PTO kit
should be considered.
790 PTO RPM is standard for most
machines. Some combines are
equipped with optional drives that
require different input speeds. Refer to
the PTO RPM on your machine.
DANGER
Check overhead clearance to ensure
that no power lines, overhead limbs, or
other obstructions exist. Combine
exceeds 13’-10” with the bin lowered.
When fully raised, the AMADAS 2100A
stretches over 24 feet tall. Contact with
an obstruction or high voltage power line
could result in death or serious personal
injury.
WARNING
Be certain the lip extension is folded out
before dumping the bin. The combine
can tip if the bin is dumped with the bin
lip extension in the stored position.
MAN143
12/18/15
35
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...