2110A PT Peanut Combine
Unloading Conveyor
Using the Conveyor
The OCS system requires that your tractor be
equipped with at least five remotes, as two are
required to operate your Off-load Conveyor
System. One remote is needed to position the
conveyor in the offloading position, and one to
operate the unloading augers and conveyor.
Note that you will need six remotes if you have
a side shift tongue.
For proper peanut flow:
•
Do NOT exceed a rate of 20 gallons/
minute hydraulic flow to the OCS system.
•
Make certain the shaft speed remains
consistent at 250 RPM. Higher speeds
result in shelling and may damage
hydraulic motor seals.
•
If possible, make sure the return line is
connected to the direct-to-tank port.
1. Hydraulic hoses were connected to the
conveyor at the factory. Connect the ends
to your tractor hydraulics.
2. Remove the shipping strap.
3. Operate the remote for the swing out
cylinder until all air is out of the system.
Once the swing out cylinder is charged, the
shipping strap is no longer needed.
4. Position the conveyor in the off-loading
position.
5. Check your tractor’s hydraulic oil level; top
off to required level.
6. Operate the remote that controls the off-
loading conveyor belt and augers until all
air has been removed from the system.
7. Check the tractor’s hydraulic oil level again
and top off if required.
8. Refer to the safety information at the
beginning of this chapter when operating
your conveyor.
IMPORTANT!
In order for the off-load
conveyor system to function properly, your
tractor’s hydraulic capacity needs to be at
least 35 GPM @ 2500 PSI.
CAUTION
Refer to Chapter 1,
Safety
, for information
on safely using hydraulics.
Swing out
cylinder
Shipping
strap
MAN143
12/18/15
41
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...