Controls and Adjustments
2110A PT Peanut Combine
Cleaning Air Control
Set the cleaning air control as follows:
•
For average conditions, set the cleaning
air control handle at the ¾ open position
for operation.
•
It is often helpful to set the air higher than
is needed and then adjust it back until no
good peanuts are being blown out the
back of the machine.
•
Use the inspection doors at the rear of
the combine to aid in setting the cleaning
air.
•
If the air is set too low, proper separation
will not occur and peanuts may ride over
the disc separator with the vines.
•
The maximum opening of the cleaning air
fan door should be at least 10-3/8”.
•
Opening the cleaning air control handle
more will remove pods containing small
shriveled peanuts.
•
Always operate with the cleaning air
control set no lower than necessary to
save all peanuts of value, while still
providing a clean sample. The maximum
open setting may be necessary in some
conditions.
CAUTION
NEVER make adjustments to cleaning air
control while the combine is running.
Serious personal injury could result.
10 3/8”
Closed
Open
¾ Open
Inspection doors
52
12/18/15
MAN143
Summary of Contents for 2110A
Page 2: ......
Page 4: ......
Page 22: ...Safety 2110A PT Peanut Combine 4 80945 6 80947 5 80946 12 12 18 15 MAN143...
Page 23: ...2110A PT Peanut Combine Safety 7 80949 8 80950 11 80936 9 80941 10 80563 MAN143 12 18 15 13...
Page 32: ...Preparation 2110A PT Peanut Combine NOTES 22 2 29 16 MAN143...
Page 56: ...Unloading Conveyor 2110A PT Peanut Combine NOTES 46 12 18 15 MAN143...
Page 78: ...Performance 2110A PT Peanut Combine NOTES 68 12 18 15 MAN143...
Page 91: ...2110A PT Peanut Combine Maintenance NOTES MAN143 12 18 15 81...
Page 92: ...Maintenance 2110A PT Peanut Combine NOTES 82 12 18 15 MAN143...
Page 98: ...Peanut Tech Monitoring and Control 2110A PT Peanut Combine NOTES 88 12 18 15 MAN143...