COMBUSTION AND VENTILATION AIR
(DIRECT/NON-DIRECT VENT MODELS)
28
Rev. 0
SUPPORT
STRAPS
90°
MEDIUM
RADIUS
ELBOWS
12' MIN.
VENT/FLUE
TEE
SCREEN
COMBUSTION
AIR INTAKE.
12' MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
12' MIN. ABOVE
HIGHEST ANTICIPATED
SNOW LEVEL
3" MIN.
24" MAX.
Horizontal Terminations
Above Anticipated Snow Level (Dual Pipe)
In a basement installation, the pipes may be run between
the joist spaces. If the pipes must go below the joist and
then up into the last joist space to penetrate the header,
two 45° elbows should be used to reach the header rather
than two 90° elbows.
Concentric Vent Termination
The Concentric Vent Kits HCVK and VCVK are designed
to allow the terminations of a direct vent furnace to be "con-
centrically" vented through a wall (HCVK) or roof (VCVK).
These kits allow a single penetration to support termina-
tions for both the vent/flue pipe and the combustion air in-
take pipe. HCVK is designed for horizontal, through the wall
terminations, while the VCVK is designed for vertical,
through the roof terminations. The appropriate kit must be
used for a given termination placement (horizontal or verti-
cal).
Concentric Vent Kits HVCK and VCVK are suitable for use
with the following Amana 90% efficient furnace product:
Description
40" Tall 90% Upflow/Horizontal Furnace
40" Tall 90% Counterflow/Horizontal Furnace
CONCENTRIC VENT KIT
Used On Models
GUCA
GCCA
Note: This kit is not certified for, and must not be applied to
any furnace not listed in the above table.
Refer to the directions provided with the concentric vent kit
for installation specifications.