3. Select the work to be performed.
4. Start the job.
The working time will be documented.
NOTE
The default setting for the type of work is
"Effective"
.
When the job is interrupted, the type of work will be
set back to the default setting.
I | Managing jobs | Define working time
MG5574-
EN
-II | B.1 | 25.10.2016
126