5.9
Performance characteristics of
the tractor
6
6.1
Calculating the required tractor
characteristics
6.2
Calculating the permissible
payload
6.3
6.3.1
Coupling the ISOBUS or control
computer
6.3.2
6.3.3
Coupling the hydraulic hose lines
6.3.4
Coupling the 3-point mounting frame
6.3.5
Coupling the Centaya pack top
seed drill
6.4
Preparing the implement for
operation
6.4.1
Opening and closing the roller
tarpaulin
6.4.2
Adjusting the working position sensor 55
6.4.3
6.4.4
6.4.5
Adjusting the coulter pressure on
the TwinTeC Special coulter
6.4.6
Adjusting the coulter pressure on
the RoTeC coulter
6.4.7
Adjusting the seed rate increase
6.4.8
Adjusting the placement depth on
the TwinTeC Special coulter
6.4.9
Adjusting the placement depth on
the RoTeC coulter
6.4.10
6.4.11
Adjusting the exact following harrow
6.4.12
6.4.13
6.4.14
6.4.15
Operating the one-sided switching
6.4.16
6.4.17
Preparing the metering unit for
operation
6.5
Preparing the machine for road
travel
6.5.1
Moving the exact following harrow
into transport position
6.5.2
Folding the tramline marker on the
exact following harrow
6.5.3
Putting the road safety bars on the
exact following harrow
7
7.1
7.2
Moving the exact following
harrow into working position
7.3
7.4
7.5
7.6
7.7
Performing maintenance work
during operation
8
9
9.1
9.1.1
Emptying the hopper via the quick
emptying
9.1.2
Emptying the hopper via the
metering unit
9.2
9.3
Uncoupling the ISOBUS or
control computer
9.4
9.5
Uncoupling the seeding
combination
9.6
Disconnecting the hydraulic
hose lines
9.7
Parking the Centaya pack top
seed drill
10.1
10.2
10.2.1
TABLE OF CONTENTS
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
II