NOTE
The sealing plugs fit only in the seed outlets,
since the tramline segments are opened and
closed electronically. To keep the tramline
segments permanently closed, disconnect the
closed tramline segments, see "Disconnecting
tramline segments".
4.
To activate tramline control,
see "ISOBUS software" operating manual
or
see "control computer" operating manual.
5.
To close all of the tramline segments,
see "ISOBUS software" operating manual
or
see "control computer" operating manual.
6.
To permanently deactivate the desired tramline
segments,
see section "Disconnecting tramline segments".
7.
To open the remaining active tramline segments
again,
advance the tramline counter.
8.
Deactivate tramline control.
6.4.14 Setting up the speed sensor
To start the metering unit(s), a speed signal is
required. The speed sensor on the implement can be
used for this.
To set up the speed sensor on the implement,
see ISOBUS software operating manual, "Setting
up the speed sensor on the implement"
or
see "control computer operating manual."
CMS-T-00003210-E.1
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
77