7.
Take the collapsible bucket
1
and calibration
scale
2
out of the mount.
1
2
CMS-I-00006783
8.
Fold down the bracket
1
on the ascent.
1
CMS-I-00005700
9.
Hang the scale
2
on the bracket
1
on the
ascent.
10. Hang the collapsible bucket
3
on the scale.
1
2
3
CMS-I-00005716
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
89