1.
Loosen the bolt
2
with the universal operating
tool.
2.
Push the sliding element
1
outwards.
3.
Tighten the bolt
2
with the universal operating
tool.
4.
Make the same setting for the other side of the
implement.
5.
To check the setting,
seed for approx. 30 m at working speed and then
check the work pattern.
1
2
CMS-I-00004674
7.3 Unfolding the tramline marker
1.
Set the implement down on the field.
2.
Take hold of the track disc carrier
1
.
3.
Pull out the pin
2
.
4.
Swivel the track disc carriers into working
position.
1
2
CMS-I-00005174
7.4 Using the implement
1.
Align the implement parallel to the ground.
2.
Lower the implement on the field.
3.
Move the hydraulic system of the 3-point power
lift into float position.
CMS-T-00007404-B.1
CMS-T-00004492-C.1
7 | Using the implement
Unfolding the tramline marker
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
94