4.
Loosen the wing nut
5
.
The fill level sensor
2
can be set vertically.
For seeds with high spread rates, the fill level sensor
can be installed closer to the front wall to prevent the
fill level alarm from reacting too early.
5.
Loosen the nuts
1
with the socket wrench
3
.
The fill level sensor
2
can be set horizontally.
6.
When the fill level sensor is set,
tighten the wing nut and nuts.
NOTE
As soon as the fill level sensor is no longer
covered, a warning message appears on the
control terminal or control computer.
When the fill level sensor is installed in the lower
area, the warning message appears very late.
5
1
2
3
CMS-I-00005301
6.4.4 Filling the hopper
1.
lower the implement.
2.
Unlock the loading board
1
with the locking
mechanism
2
.
3.
Swivel the loading board down.
4.
Open the roller tarpaulin.
2
1
CMS-I-00005277
CMS-T-00009947-A.1
6 | Preparing the implement
Preparing the implement for operation
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
57