15.
To lock the calibration bucket,
attach the linch pin
1
onto the holder.
1
CMS-I-00006873
6.5 Preparing the machine for road travel
6.5.1 Moving the exact following harrow into transport position
The outer harrow elements can exceed the
permissible transport width during transport. To avoid
exceeding the permitted transport width, the exact
following harrow must be moved into transport
position before road transport.
1.
Loosen the bolt
2
with the universal operating
tool.
2.
Push the sliding element
1
into the carrier tube
3
up to the stop.
3.
Tighten the bolt
2
with the universal operating
tool.
4.
Make the same setting for the other side of the
implement.
1
2
3
CMS-I-00004675
6.5.2 Folding the tramline marker on the exact following harrow
To be able to move the tramline marker into transport
position, no tramlines may be created in the ISOBUS
software or on the control computer.
CMS-T-00009809-A.1
CMS-T-00006417-A.1
CMS-T-00007448-B.1
6 | Preparing the implement
Preparing the machine for road travel
MG7508-EN-GB | B.1 | 31.08.2022 | © AMAZONE
91