6.
Remove both locking rings
1
.
7.
Remove the gear pair
2
.
8.
Interchange the gear pair.
9.
Install the gear pair.
10. Install the two locking rings.
11. Install the gearbox cover with gasket.
12.
When the gearbox has reached operating
temperature,
check the gearbox for leaks.
CMS-I-00003026
6.7.12 Adjusting the section end position
The end position of the sections is pre-set so that the
implement sections are horizontal during operation.
This setting can be adapted to the operating
conditions.
1.
Raise the implement.
2.
To engage the transport lock,
fold the implement sections.
3.
Loosen the lock nut
1
.
4.
Move the setting screw
2
to the desired
position.
5.
Tighten the lock nut.
6.
Move the second setting screw
4
to the same
position.
Both setting screws must touch the end stops
3
at the same time.
7.
Make the same setting for the opposite side of the
implement.
8.
After 5 hours of operation, check the bolt
connection for tight fit.
CMS-I-00002989
CMS-T-00004132-A.1
6 | Preparing the machine
Preparing the implement for operation
MG6750-EN-II | C.1 | 21.07.2021
73
Summary of Contents for KG 6002-2
Page 1: ...Original operating manual Rotary cultivator KG 6002 2 SmartLearning www amazone de...
Page 6: ......
Page 117: ......