2. Empty the metering unit.
2.1 Lower down the carriages until the stop
and open the injector sluice flap, refer
to 8.3, page 134.
The contents of the metering unit drop
into the carriages.
Fig. 232
3. Remove the metering roller from the
metering unit housing.
3.1 Loosen, but do not remove, the two
bolts (Fig. 233/1).
Fig. 233
3.2 Twist and remove the bearing cover
(Fig. 234/1).
Fig. 234
The bearing cover is equipped with an
O-ring (Fig. 235/1). Check the O-ring
and replace it if damaged.
Fig. 235
Summary of Contents for Amazone Centaya 3000 Super 1600
Page 2: ......
Page 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Page 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Page 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Page 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Page 220: ......
Page 221: ......