8
Centaya Super BAH0092-6 10.20
8.14
Moving the exact following harrow road safety bar into road transport/parking
position ................................................................................................................................ 167
8.14.1
Moving the road safety bar into road transport position ...................................................... 167
8.14.2
Moving the road safety bar into parking position ................................................................ 167
9
Transportation ......................................................................................... 168
9.1
Moving the seeding combination into transport position ..................................................... 168
9.2
Legal regulations and safety ............................................................................................... 169
10
Use of the implement .............................................................................. 173
10.1
Initial operation .................................................................................................................... 174
10.2
Work floodlights ................................................................................................................... 174
10.3
Coulter array lighting ........................................................................................................... 175
10.4
Moving the implement from transport into working position ................................................ 175
10.5
Work commencement ......................................................................................................... 175
10.6
During operation .................................................................................................................. 177
10.6.1
Overview of the inspections ................................................................................................ 177
10.6.2
Turning at end of the field ................................................................................................... 178
10.6.3
Track marker ....................................................................................................................... 179
10.6.4
End of work on the field ....................................................................................................... 180
10.7
Emptying the hopper and metering unit and replacing the metering roller ........................ 181
10.7.1
Hopper quick emptying ....................................................................................................... 182
10.7.2
Emptying the hopper and/or metering unit and replacing the metering roller ..................... 183
11
Faults ........................................................................................................ 186
11.1
Residual seed quantity display ............................................................................................ 187
11.2
Deviations between the set and actual seed rate ............................................................... 187
12
Maintenance and repairs ........................................................................ 188
12.1
Maintenance schedule ........................................................................................................ 188
12.2
Lubrication schedule / lubrication points ............................................................................. 189
12.3
Safety .................................................................................................................................. 190
12.3.1
Safety when cleaning the implement .................................................................................. 191
12.3.2
Safety when working on the distributor head ...................................................................... 193
12.3.3
Safety when working on the hydraulic system .................................................................... 193
12.4
Repairs ................................................................................................................................ 194
12.4.1
Cleaning the fan suction guard screen................................................................................ 194
12.4.2
Cleaning the fan rotor .......................................................................................................... 194
12.4.3
Clean the distributor head ................................................................................................... 194
12.4.4
Visual inspection of the top link and lower link pins ............................................................ 195
12.4.5
Visual check of the hydraulic hose lines and couplings ...................................................... 196
12.4.5.1
Date of manufacture of the hydraulic hose line ................................................................... 196
12.5
Installations ......................................................................................................................... 197
12.5.1
Installing plugs to increase the row spacings ...................................................................... 197
12.5.2
Checking / readjusting / replacing the TwinTeC roller scraper ........................................... 198
12.5.3
Shutdown of the implement over a long period of time ....................................................... 199
12.6
Workshop work .................................................................................................................... 200
12.6.1
Checking the hydraulic hose lines ....................................................................................... 200
12.6.1.1
Safety when working on hydraulic hose lines ..................................................................... 201
12.6.2
Checking and readjusting the TwinTeC disc bearings ........................................................ 202
12.6.2.1
Checking the TwinTeC disc bearings .................................................................................. 202
12.6.2.2
Readjusting the TwinTeC disc bearings ............................................................................. 202
12.6.3
Checking / replacing the TwinTeC inner scraper ................................................................ 204
12.6.4
Checking / replacing the TwinTeC baffle lip ........................................................................ 205
12.6.5
Dismounting the TwinTeC seed line ................................................................................... 206
12.6.6
Checking / replacing the TwinTeC press roller ................................................................... 207
12.6.7
Adjusting the tramline control .............................................................................................. 208
12.6.7.1
Setting the tramline track width ........................................................................................... 209
12.6.7.2
Setting the tramline wheelmark width ................................................................................. 209
12.6.7.3
Removing and installing the segment in the distributor head ............................................. 210
Summary of Contents for Amazone Centaya 3000 Super 1600
Page 2: ......
Page 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Page 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Page 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Page 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Page 220: ......
Page 221: ......