Structure and function
88
Centaya Super BAH0092-6 10.20
5.18
Seed pre-metering
Seed pre-metering, which meters the seeds in the air current before the implement starts up, can be
switched on in the ISOBUS control terminal.
The seed pre-metering is used e.g., when corners need to be seeded, which can only be reached by
reversing the implement with the coulters lifted.
The runtime of the seed pre-metering can be adjusted, refer to the "ISOBUS software" operating
manual.
5.19
Start-up ramp
After turning at the end of the field, seed is metered into the delivery line as soon as the implement is
lowered into working position.
As a general rule, the speed of the metering roller is automatically adjusted for changes in the working
speed.
During the acceleration phase of the implement, the seed is metered at low speed and only deposited
in the soil when the implement's speed is much higher.
Activating the "start-up ramp" on the ISOBUS control terminal prevents that too little seed is metered
during the acceleration phase. The time until the intended working speed is reached depends on the
respective tractor acceleration. For this reason, the factory-set values can be changed and adapted to
the actual conditions.
The intended working speed, the starting speed [%], and the time until the intended working speed is
reached can be set, see also "ISOBUS software" operating manual.
Example
Values that can be set on the control terminal
Probable
working speed: ......................... 10 km/h
Starting speed: ......................... 50 %
Time to achieve working speed: . 8 seconds
Fig. 92
Summary of Contents for Amazone Centaya 3000 Super 1600
Page 2: ......
Page 23: ...General Safety Information Centaya Super BAH0092 6 10 20 23 Fig 2 Fig 3 Fig 4...
Page 93: ...Structure and function Centaya Super BAH0092 6 10 20 93 Fig 99...
Page 217: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 217 Fig 271...
Page 219: ...Hydraulic diagrams Centaya Super BAH0092 6 10 20 219 Fig 272...
Page 220: ......
Page 221: ......