Copyright 2018 by Amber Kinetics. All rights reserved.
16
M32 FLYWHEEL - INSTALLATION & MAINTENANCE MANUAL
3.1 - Planning
When planning a multi-M32 flywheel installation:
•
The total DC capacity will be 8kw times the number
of M32 flywheels in the installation.
•
Each block of M32 flywheels consists of two rows.
•
Figure 3 displays the minimum clearance
requirements between individual M32 flywheels,
blocks, and the site perimeter.
Figure 3: Clearance requirements at a multi-M32 flywheel site