CEMENT BOARD INSTALLATION

TIME REQUIRED

1-

3

 HRS

apply silicone

diagram 4

We recommend the use of ½" thick cement board as your shower backer. This is a common backer for stone and tile. 

Using this backer will help comply with almost all city codes. A product like WonderBoard

®

 or HardieBacker

®

 may be used if 

it meets your local codes. Some codes may also require a vapor barrier to be installed. We recommend using a 6 mil. 

plastic water/vapor barrier and should be installed prior to the cement board. To do this, staple plastic so that it hangs 1" 

above the floor. 

DO NOT USE AN ELASTOMERIC WATERPROOFING MEMBRANE ON YOUR CEMENT BOARD (such as RedGard)

. Roofing 

nails may be used to attach the cement board instead of screws, to prevent the plastic from wrapping around the screws. 

I

MPORTANT

: Walls must be solid, plumb, and square within ⅛" of true. Use your 

cement board as an indicator of squareness. If you see gaps or areas where the 

cement board is not fitting flush, fix the problem by removing the cement board 

and shimming the boards until it’s square and flush. This kit is designed with some 

allowances for minor alignment issues.

1.

2.

3.

Cut cement board to fit "

inside

" the metal flange. Sanding or shimming out the 2 x 4's  

may be required to flush, level and square the cement board. (

dia. 5

Place a bead of 100% silicone on the front INSIDE face of the shower pan flange. The 

bead should be in a zig-zag pattern.

 (dia. 5)

Install the cement board against the studs and rest it inside the shower pan against 

the metal flange. Attach the cement board to the studs with screws or nails. 

DO NOT

 

screw or nail into the metal shower pan flange.

4. Continue installing the remaining cement board. It is best to seal all joints at the

 same

time you silicone the wall panels in to place.

5. Clean the wall surface with a damp cloth to remove any dust, dirt, or any other

contaminants.

 

silicone

5

SETTING PAN

TIME REQUIRED

½ HR

cut out view 

of drain 

collar over 

2" drain pipe

#1

 trim plate 

#2

 drain tool 

#3

 pressure ring 

#4

 rubber seal

1.

Now that the drain is installed onto the pan and has dried, dry fit the pan and your drain

for alignment. Check to make sure the 2" drain pipe is in the center of the pan drain hole

and that the 2" drain pipe does not extend past the inside threads of the drain collar.

2.

Make sure the pan and drain fit level to the floor.

3.

Remove pan and apply 100% Silicone to floor. (

dia. 4

)

4.

Carefully lift the shower pan and set into place. Make sure the ABS pipe is still centered.

5.

6.

7.

Finish installing the drain assembly. Find the rubber seal #4 and slide onto the 2" ABS 

pipe. 

(You can use soapy water to help it slide down the pipe)

 It should seat against the 

bottom of the drain collar. 

Next drop the pressure ring #3

 

into the drain collar and use the drain tool #2 and a flat 

head screwdriver to screw it until it touches the rubber seal. Remove the drain tool 

after the pressure ring is installed.

Test and snap that the decorative trim plate #1 sits into position. You may need to 

adjust the tabs for a good fit. 

(Remove the decorative trim plate and store in secure area 

until installation is complete, drain will be grouted when shower is grouted)

After installing pan, cover with cardboard or drop cloth to protect pan from scuffs.

8.

Summary of Contents for Sistine Stone Alcove

Page 1: ...olition scheduling your installer or building your shower double check that you have all the parts from the factory Some applications may require a licensed plumber or contractor Do not use any product spec sheets to begin installation before receiving product These spec sheets are for reference only Use actual product measurements only The diagrams throughout this guide illustrate a 60 x 30 showe...

Page 2: ...x 4 studs may be required to flush the studs with the metal pan flange When screwing in the cement board the metal flange will pull fast to the studs and will secure the metal pan in place dia P PRE INSTALLATION TEAR DOWN TIME 8 16 HRS 1 NOTE Due to some rough handling during shipping you can water test pan before installation to check for any issues INSIDE OPTIONAL SHAMPOO SHELF INSTALLATION TIME...

Page 3: ...shelf minimum gap required for shampoo shelf 11 triple studs 1 Locate the drain assembly to install into pan 2 3 4 Take drain assembly apart and set parts 1 4 in a safe place for installation later Apply a generous bead of 100 silicone around the shower pan drain hole and around the outside of the drain collar 5 insert the drain collar 5 into the drain hole Apply a generous bead of 100 silicone ar...

Page 4: ...nge Attach the cement board to the studs with screws or nails DO NOT screw or nail into the metal shower pan flange 4 Continue installing the remaining cement board It is best to seal all joints at the same time you silicone the wall panels in to place 5 Clean the wall surface with a damp cloth to remove any dust dirt or any other contaminants silicone 5 SETTING PAN TIME REQUIRED HR cut out view o...

Page 5: ... shim the gap if needed Make sure to align any channels For sliding door insert plug dia 11 Place the remaining side casings into position 3 per side and cap Use a level and the plumb line previously drawn on the cement board to align the side casings vertically TP TD flush with threshold small gap silicone A Pan Thresholds 1 No glass showers have 2 threshold pieces TD dig 6A 7 top Hinged glass sh...

Page 6: ...g Panels After determining the Wall Model type you have you will start installing panels in sequential order Follow the order in the image above of your Wall Model type 1 The panels are numbered on the back start with the 1 back panel Next 2 right side panel and then the 3 panel L3 L1 4 1 3 2 After panel 3 is installed the accent liners will be installed Start with L1 liner from left to right on h...

Page 7: ...ep loose dia 18 Put the second bolt through the lower hole Place the flat washer onto the bolt Screw the bolt into the bottom handle dia 18 Align the handle on the door and carefully tighten the long bolts Do not over tighten Place the opposite handle over the long bolts and tighten the set screws to secure the handle B H I Locate the top hinge GH and remove the side plate by loosening the two scr...

Page 8: ...sing top hinge pin bracket pin hole pan threshold C F G G 1 Gently insert the side glass panel into the channels You will be adjusting the fixed glass panel so it s level with the door and has an even gap between the door and the glass panel Use rubber setting block to adjust height and level if necessary 2 Next to determine the position of the bottom hinge pin hole place the top hinge pin bracket...

Page 9: ...3 Dry fit the Fixed Glass Panel in place Place the fixed glass panel into the channel of the wall casing there is not a channel in the pan threshold 100 silicone along with the side casings will hold the glass in place 4 Now that you have dry fitted the fixed panel remove the panel and silicone in place Place a bead of 100 silicone in the channel of the wall casings and on the pan threshold Only a...

Page 10: ...oor unscrew the bolt from the inside bracket Place the outside bracket on the outside of the door and place the inside bracket and wheel into the cutout section of the shower door diagram 17 Push the bolt through the inside bracket until it screws into the outside bracket Repeat for the remaining wheels After 30 minutes to an hour the100 silicone on the fixed glass panel should be secure enough to...

Page 11: ...ged tile silicone a replacement tile in place and grout Cracked Wall Panel Seam If your wall panel developed a crack in a grout line simply grout over the cracked seam when it is installed The grout will correct the problem you will not be able to tell the crack was ever there Scratches Blemishes Can be removed by wet sanding the tile surface Make sure tile surface and sandpaper are wet and sand t...

Reviews: