CEMENT BOARD INSTALLATION

TIME REQUIRED

1-2 HRS

We recommend the use of 1/4” thick cement board as your shower backer. This is a common backer for stone and tile. Using this backer will help comply with 

almost all city codes. A cement-based product like Wonderboard or Hardibacker may also be used if it meets your local codes. Some codes require a vapor  

barrier to be installed as well. We recommend a water/vapor barrier of 6 mil. plastic be installed before installing the cement board. To do this, staple plastic 

so that it hangs 1” above the floor. Roofing nails may be used to attach the cement board instead of screws, this prevents the plastic from wrapping around the 

screws. 

  1.  IMPORTANT: Use your cement board as an indicator of squareness. The cement board comes in    

    square sheets. If you see gaps or areas where the cement board is not fitting flush, fix  

 

    the problem by removing the cement board and shimming the board until it’s square and  

 

    flush. If the seams of the cement board are not flush and square, your wall panels will not  

 

    be square and flush.
 

  2.  Place the cement board against the studs and rest it on the top of the shower pan, back  

 

    flange. Attach the cement board to the studs with screws.

diagram 5

Set cement board on top of pan here

7

SETTING PAN

TIME REQUIRED

½ HR

apply silicone

  1.  Apply adhesive to floor 

  2.  Carefully lift the shower pan and set into place. Make sure the ABS pipe is still centered.

  3.  Push and secure the rubber seal #4 onto the 2” ABS pipe.

  4.  Thread on the brass pressure ring #3 around the drain pipe with the provided tool #2.  

    Remove the tool after the brass pressure ring is installed.

  5.  Test and snap the decorative diamond trim plate #1 into position. (Remove the decorative trim    

  plate and store in secure area until installation is complete, drain will be grouted when  

    shower is grouted).

  6.  After installing pan, cover with cardboard or drop cloth to protect pan from scuffs.

High quality thinset may be used on uneven floors

Recommended silicone adhesive on page 7

diagram 4

For best cutting results for wall panels and cement 
board, use a Makita grinder with a 4” tile blade.

Summary of Contents for Sistine Stone Single Alcove-Hsf

Page 1: ...ower Installation time may vary depending on your experience complexity of shower and Pre Installation Preparation Work which may include plumbing relocation drain location and bathroom demolition Pri...

Page 2: ...LAR SAW BRACES TO SECURE WALL PANELS SILICONE FOR CAULKING GUN See silicone recommendations Page 7 2 CHECK YOUR SHIPMENT AGAINST APPROPRIATE PACKING LIST Make sure you have received all the items nece...

Page 3: ...y screwing in the 1 4 cement board the metal flange will pull fast to the studs and will secure the metal pan in place diagram 1 With the pan in position check to make sure the 2 drain pipe is in the...

Page 4: ...drain collar pan 6 rubber gasket 7 teflon slide ring 8 drain lock nut apply silicone around drain collar sides and under lip floor hole with 2 drain pipe diagram 3 1 Remove the shower pan to a safe l...

Page 5: ...If the seams of the cement board are not flush and square your wall panels will not be square and flush 2 Place the cement board against the studs and rest it on the top of the shower pan back flange...

Page 6: ...osition diagram 7 Rest 2B panel onto the pan floor use spacers between the floor and the panel to make the top of the panel level 2 Place the second bottom panel 1B into position push the two panels t...

Page 7: ...roper amount you will need for the project based on your shower size Depending on the size and threshold type of your shower you will need from 10 20 9 8 oz tubes of silicone to complete your shower i...

Page 8: ...ush with the inside of the shower pan threshold diagram 15 Make sure to align the glass channels in the thresholds with the glass channels in the shower pan if glass unit 4 Place the remaining trim pi...

Page 9: ...from the bolt 5 Start with the top hole on the glass door Place the long bolt through the hole in the door keeping the remaining rubber pieces on the bolt On the other side of the glass place the flat...

Page 10: ...nto the studs behind the decorative stone threshold 4 Re align the door and install screws in hinges 5 Install the door sweep onto the bottom of the door with the water flap facing the inside of the s...

Page 11: ...Medium Sistine Stone use Linen Product No 15303 2 Follow the grout directions for specific application instructions a water based non sanded grout is recommended 3 If you desire a powdered grout use...

Page 12: ...13395 Estelle Street Corona California 92879 Phone 800 454 2284 Fax 951 734 1480 Visit us at www americanbathfactory com NOTES...

Reviews: