11
1. Leveling Dryer
a. To level the dryer, place 4-inch (10.16 cm) metal shims or other suitable material under the base pads.
It is suggested that the dryer be tilted slightly to the rear (refer to the
illustration
above
).
b. The V-belts are disconnected from the basket (tumbler) drive motor for shipping. Reconnect V-belts
before starting the dryer.
10. The dryer
must be
installed with provisions for adequate combustion and make-up air supply.
CAUTION:
This dryer produces combustible lint and
must be
exhausted to the outdoors. Every 6
months, inspect the exhaust ducting and remove any lint build up.
B. UNPACKING/SETTING UP
Remove protective shipping material (i.e., plastic wrap, and/or optional shipping box) from dryer.
IMPORTANT:
Dryer
must be
transported and handled in an upright position at
ALL
times.
The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid
the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are
at the rear base, and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts
located in the lint chamber area, remove the lint drawer and the three (3) Phillips head screws securing the lint
door in place.
Summary of Contents for ID-170
Page 25: ...21 ...
Page 55: ...ADC 113331 1 08 27 01 25 ...