37
9. Make a complete operational check of
ALL
operating controls.
a. Microprocessor controller (computer) programs/selections...
1) Each microprocessor controller (computer) has be preprogrammed by the factory with the most
commonly used parameter (program) selections. If computer changes are required, refer to the
computer programming manual, which was shipped with the dryer.
b. Dual Timer check...
1) Heating Timer
2) Cool Down Timer
3) Temperature Selection Switch
Summary of Contents for ID-170
Page 25: ...21 ...
Page 55: ...ADC 113331 1 08 27 01 25 ...