R
EV
9
49
A
MERICAN
M
AGNETICS
, I
NC
.
O
PERATION
Operation
This section describes the operation of the Model 430 Programmer.
Every menu and submenu item is illustrated and described in detail. An
example setup of the Model 430 Programmer is presented on page 108.
An example ramping operation is presented on page 121.
S
YSTEM
P
OWER
O
N
/O
FF
S
EQUENCE
The Model 430 Programmer should always be energized
before
the
power supply(s) that it is controlling. The Model 430 Programmer is
designed to prompt the user in order to ensure the power supply is
energized at the proper time. The Model 430 Programmer should always
be de-energized
after
the power supply is shut down.
M
ODEL
430 P
ROGRAMMER
P
OWER
O
N
/O
FF
Place the Model 430 Programmer power switch in the
I
(ON) position.
After the Model 430 Programmer is powered on and fully initialized
(about 20 seconds), the following display will appear:
After
this screen is displayed, the power supply can be powered up (See
“Energizing the Power Supply and Components” on page 50.)
followed
by
pressing the
ENTER
key on the Model 430 Programmer. This brings
up the default display.
0.00 A -
Turn on power supply
0.00 Vs
Press ENTER to continue
Summary of Contents for 430
Page 2: ......
Page 16: ...XVI REV 9 AMERICAN MAGNETICS INC FOREWORD SAFETY SUMMARY ...
Page 28: ...12 REV 9 AMERICAN MAGNETICS INC INTRODUCTION OPERATING CHARACTERISTICS ...
Page 64: ...48 REV 9 AMERICAN MAGNETICS INC INSTALLATION POWER UP AND TEST PROCEDURE ...
Page 208: ...192 REV 9 AMERICAN MAGNETICS INC SERVICE RETURN AUTHORIZATION ...
Page 248: ...232 REV 9 AMERICAN MAGNETICS INC APPENDIX SHORT SAMPLE MODE ...