5800 SE 78th St. Ocala, FL 34472
14
P: (800) 327-3015
E: Service@americanpanel.com
AP20BCF200-3-XL Installation & Operations Manual
Step
Description
Diagram
14
Install the side shrouds, observe the
markings on the shrouds to know which
side of the unit it mounts on. To secure the
shrouds to the ceiling panel use 8 pcs of
the sheet metal self tapping screws located
inside the bag labeled “Shrouds Fasteners”.
The mounting holes into the ceiling panel
are pre-drilled.
15
Mount the sides air seals, use 7 pcs of the
provided sheet metal self tapping screws. To
secure the side air seals to the side shrouds
use 2 pcs of the 10-24 x ¾” hex head
washer screws. All screws are located inside
the bag labeled “Shrouds Fasteners”.
16
Mount and secure the front shroud, use the
provided 3pcs 10-24 x ¾” hex head washer
screws. Note the cut out into the back of the
front shroud, the cut-out must accommodate
the retaining clips mounted on the ceiling
panel.
17
Secure the threshold plate to the interior
floor sheet metal. Fasten the door threshold
plate to the floor metal using the supplied
screws located inside the bag labeled “
Threshold Fasteners”.
18
Make the main power connection inside the 4x4 junction box directly connected to the controller via a cord,
located on top of the unit and labeled “Main Power Connections”. The electrician to connect the unit to main
power, observe the electrical requirements marked on the safety label located on the right side of the control
panel.
Note: To ensure proper phase sequence at the scroll compressor, the unit is equipped with a phase
monitor. If when powered the controller display does not light up reverse two of the phases inside
the junction box labeled “Main Power Connections”.