OWNERS MANUAL
9
INSTALLATION PROCEDURES
WARNING:
Never allow the weight of the tub to be supported by wood support stringers and
do not use
integral tile flange (if equipped) to screw or nail in place,
as this will result in product failure and will
void the warranty.
6. Verify the product is completely level by checking tub deck surface and ensure all leveling feet are
touching the ground.
7. Electrical connection is made by simply plugging each cord into the GFCI outlet.
8. After plumbing and electrical connections have been made, the tub and door seal should be cleaned of dirt
and debris. Use warm water and a non abrasive cleaner for clean up.
9. Installation is not complete until the bathtub has been water-tested in place and does not leak.