background image

18-HE58D1-3

5

Installer’s Guide

INSTALLATION GUIDELINES

GENERAL GUIDELINES

1)

Do operate the ERV independent of the indoor central
heating and cooling blower system (furnace / air
handler). Independent operation of the ERV allows
the ERV to introduce the minimum required fresh air
at all times of the year.

2)

Do Not set up a control system that requires the
indoor (furnace / air handler) blower for the heating
and cooling system to operate (when in the cooling
mode) when the ERV operates. Fan operation during
the cooling mode without cooling occurring is not
recommended under most circumstances and applica-
tions. Fan operation evaporates the condensed mois-
ture (water) on the cooling coil and results in in-
creased Relative Humidity inside the home. For
exceptions and additional details, see the ERV Appli-
cation Bulletin.

3)

Humidifiers and ERV/HRV’s.  When the “fresh air” is
ducted into the return duct and the system is to have
a humidifier, install a “fan power humidifier.” Do not
install a by-pass humidifier, as it can freeze based on
the installation, outdoor temperature and homeowner
thermostat setback requirements.

APPROVED INSTALLATIONS

I)

Separate Room Exhaust Air Pick-Up / Fresh Ex-
changed outside air to central system return air

ERV

RA (Furnace)

Minimum 3'

Furnace

SA

EA

OA

FA

(example, from bathrooms,
 dining area)

OA

RA

Figure 7

Legend

RA - Room Air

OA - Outside Air

FA - Fresh Air

EA - Exhaust Air

SA -Supply Air

Note:  Entering mixed air temperature to furnace (fur-
nace heating air) must be above 50°F (18°C) to prevent
condensation in furnace heat exchanger.

II)Separate Return Air and Fresh Air Supply

RA

 (example, from bathrooms, 
   kitchen area)

Furnace

RA (Furnace)

OA

ERV

EA

FA

Living area*

Figure 8

Note: Introduce fresh air where good mixing will occur to
minimize discomfort to occupants.

NON APPROVED / NOT RECOMMENDED
INSTALLATIONS

I)Exhaust Air and Fresh Air Ducted To System Return Air

Duct

Minimum 3'

Furnace

SA

RA (to ERV)

OA

ERV

Minimum 3'

FA

Minimum 3'

FA

FA

EA

RA (Furnace)

Figure 9

Note: Application requires indoor blower to be running
when ERV runs. This is in violation of General Guideline
#2 on page 3.

Summary of Contents for AERVR100A9P00A

Page 1: ...ION NOR CAN IT ASSUME ANY LIABILITY IN CONNECTION WITH ITS USE CAUTION To prevent shortening its service life the ERV should not be used during the finishing phases of construction Compounds used in c...

Page 2: ...uctural alterations necessary for installation must comply with all applicable building health and safety code requirements ERV LOCATION CONSIDERATIONS Select a location to install the ERV with the ob...

Page 3: ...S Access Door Swings Open Down The unit may be fastened directly to floor joists using the hanging bracket and integral flange Mount as described for installation on a concrete foundation wall except...

Page 4: ...The unit may be installed in a variety of positions EXCEPT as noted in Figure 6d APPROVED MOUNTING POSITIONS HINGE HINGE Figure 6a Hinges on Bottom HINGE HINGE Figure 6b Hinges on Right HINGE HINGE Fi...

Page 5: ...fan power humidifier Do not install a by pass humidifier as it can freeze based on the installation outdoor temperature and homeowner thermostat setback requirements APPROVED INSTALLATIONS I Separate...

Page 6: ...ing flexible duct band or tape the inner duct liner to the inner flange of appropriate collar Drive a sheet metal screw through the liner to secure the duct spiral wire to the collar Straighten insula...

Page 7: ...tall hood and ductwork through penetration See figure 13 for sealing duct penetration and duct collar Fill and seal COMPLETELY with Expanded Foam Figure 13 DUCTWORK CONNECTING ERV TO INDOOR TERMINATIO...

Page 8: ...ble from your local distributor MicroSoft Excel is required to run this program The calculator input can accept a minimum ventilation airflow requirement per local code or calculate the minimum airflo...

Page 9: ...ain and the unit will run 40 minutes A third press provides for 60 minutes of operation Percent Timer Control does not need to be on for the PB Control to operate the ERV unit You can cancel a cycle a...

Page 10: ...o 10 unit should start and run for approximately six minutes 11 Go to outside of building and check for airflow at inlet and outlet hoods Check that weatherhood screens are in place and clean Make sur...

Page 11: ...18 HE58D1 3 11 Installer s Guide...

Page 12: ...policy of continuous product and product data improvement it reserves the right to change design and specifications without notice AmericanStandardInc 6200TroupHighway Tyler TX75711 Formoreinformation...

Reviews: