Installer’s Guide

NOTE for ERV systems with more than one
control:

Another control may be causing your ventilator to run -
even if the runtime % light on this control is off. If you
wish to keep your ventilator from running, check that
none of your controls are calling for unit operation.

INSTALLATION

1.

Install control in a standard 2" x 4" electrical box,
with a minimum depth of 1.5", with the two screws
provided.

2.

Wire Size: 18 gauge, no more than 500 feet. Wiring is
non-polar.

3.

The two wires from the ERV should be attached to the
‘C’ and ‘R’ positions on the terminal block on the back
of the PT Control. See Figure 13.

4.

Use Lutron Decora™  cover plate to complete the
installation (supplied by installer).

Push Button Point-of-use

Control (Optional Accessory)

For use with all ERV models

OPERATION

The Push Button (PB) Point-of-use Control lets you
manually turn on your energy recovery ventilator for a
short period of operation – for example, when you are
using a bathroom.  The PB Control must be connected to a
PT control to operate.

20-40-60 MINUTE VENTILATION CONTROL:

Press the fan icon and your ventilator will run for 20
minutes.  Press again and the unit will run 40 minutes.  A
third press provides for 60 minutes of operation.  Percent
Timer Control does not need to be on for the PB Control to
operate the ERV unit.

You can cancel a cycle at anytime.  Just press the logo and
hold for about five seconds.

You can start another cycle by pressing the logo.

NOTE FOR ERV SYSTEMS WITH MORE
THAN ONE CONTROL:

Another control other than the push button may be
causing your ventilator to run. If you wish to keep your
ventilator from running, check that none of your controls
are calling for unit operation.

INSTALLATION

4.

Install control in a standard 2" x 4" electrical box,
with a minimum depth of 1.5", with the two screws
provided.

5.

Wire Size: 18 gauge, no more than 500 feet. Wiring is
non-polar.

6.

Two wires from the PB Control should be attached to
the ‘PB” positions on the terminal block on the back of
the Percent Timer Control.

7.

For two PB controls, one wire from each can be
twisted together and inserted into a single position on
the terminal block on the Percent Timer Control.  The
wires must be a 18 gage solid wire.  If more than two
PB controls are attached or 18 gage stranded wire is
used then pigtails must be inserted into the ‘PB’
positions on the Percent Timer Control and the leads
attached to the pigtails with wire nuts.

8.

Use Lutron Decora™ cover plate to complete installa-
tion.

Summary of Contents for AERVR100A9P00A

Page 1: ...ION NOR CAN IT ASSUME ANY LIABILITY IN CONNECTION WITH ITS USE CAUTION To prevent shortening its service life the ERV should not be used during the finishing phases of construction Compounds used in c...

Page 2: ...uctural alterations necessary for installation must comply with all applicable building health and safety code requirements ERV LOCATION CONSIDERATIONS Select a location to install the ERV with the ob...

Page 3: ...S Access Door Swings Open Down The unit may be fastened directly to floor joists using the hanging bracket and integral flange Mount as described for installation on a concrete foundation wall except...

Page 4: ...The unit may be installed in a variety of positions EXCEPT as noted in Figure 6d APPROVED MOUNTING POSITIONS HINGE HINGE Figure 6a Hinges on Bottom HINGE HINGE Figure 6b Hinges on Right HINGE HINGE Fi...

Page 5: ...fan power humidifier Do not install a by pass humidifier as it can freeze based on the installation outdoor temperature and homeowner thermostat setback requirements APPROVED INSTALLATIONS I Separate...

Page 6: ...ing flexible duct band or tape the inner duct liner to the inner flange of appropriate collar Drive a sheet metal screw through the liner to secure the duct spiral wire to the collar Straighten insula...

Page 7: ...tall hood and ductwork through penetration See figure 13 for sealing duct penetration and duct collar Fill and seal COMPLETELY with Expanded Foam Figure 13 DUCTWORK CONNECTING ERV TO INDOOR TERMINATIO...

Page 8: ...ble from your local distributor MicroSoft Excel is required to run this program The calculator input can accept a minimum ventilation airflow requirement per local code or calculate the minimum airflo...

Page 9: ...ain and the unit will run 40 minutes A third press provides for 60 minutes of operation Percent Timer Control does not need to be on for the PB Control to operate the ERV unit You can cancel a cycle a...

Page 10: ...o 10 unit should start and run for approximately six minutes 11 Go to outside of building and check for airflow at inlet and outlet hoods Check that weatherhood screens are in place and clean Make sur...

Page 11: ...18 HE58D1 3 11 Installer s Guide...

Page 12: ...policy of continuous product and product data improvement it reserves the right to change design and specifications without notice AmericanStandardInc 6200TroupHighway Tyler TX75711 Formoreinformation...

Reviews: