THANK YOU...
for selecting an American Standard bath. Your new bath is shipped to you after careful inspection. All you need
to finish the installation are your selected fittings.
To ensure maximum performance and pleasure from this product, please follow the instructions and cautions.
!
!
!
!
!
!
!
!
WARNING: Risk of hyperthermia and possible drowning.
People using medications and/or having adverse medical
history should consult a physician before using this product.
WARNING: Risk of personal injury.
Do not overfill bathtub before entering. Entering tub when filled more than 2/3 can
cause overflow and slippery conditions. Exercise caution when entering and exiting.
WARNING: No Food or Alcoholic Beverages.
Use of your bathtub immediately after meals is not recommended.
Avoid alcohol consumption before or during bathing. Alcoholic beverages can cause drowsiness or hyperthermia
resulting in loss of consciousness or even drowning.
Use this unit only for its intended use as described in this manual.
Do not use any attachments not recommended by American Standard.
SA
VE
THESE INS
TR
UCTIONS
Each bath arrives ready for installation however, a drain/overflow kit is required for each bath and it is not included.
The variety of installations for this bath may require framing procedures other than those shown. Locate studs as required.
Ensure roughing-in dimensions are proper, plumb, and square.
INSTALLATION AND FRAMING INSTRUCTIONS
Remove the bath from the carton. Retain the shipping carton until satisfactory inspection of the product has been
made.
Do not lift the bath by the plumbing at any time; handle by the shell only.
All bath units are factory tested for proper operation and watertight connections prior to shipping.
Prior to
installation, the bath must be filled with water and operated to check for leaks that may have resulted
from shipping damage or mishandling.
The sumps of these baths are supported by feet and no additional sump support is required.
Once the
bath is in place, the feet should be shimmed and secured accordingly so that the rim of the bath
contacts the stringer or pier but supports no weight.
It is strongly recommended that an additional opening be provided for access to drain components.
Each bath has a nominal length (L), width (W), and Height (H) along with a rim height. Unless otherwise noted
in the following rough-in references, assume that the nominal tolerances are as much as +/-1/4 inch (6mm).
Therefore, it is strongly recommended that the installer build the surrounding structure after receiving the actual
bath. Structural measurements should be verified against the actual bath received to ensure proper fit.