M968918 Rev.1.4
Certified to comply with ASME A112.18.1M
U.S. Patent No. 5,819,789
Turn off hot and cold water
supplies before beginning.
CAUTION
Installation
Instructions
2064.461
ROUGHING-IN
DIMENSIONS
1
INSTALL VALVE BODY
Determine where the finished wall location will be.
This measurement
is very important!
Note: The rough-in measurement from the finished
wall is; 1" minimum and 2" maximum. This is a 1" tolerance. See
rough-in illustration above.
Secure FAUCET BODY
(1)
to cross brace of wall structure
at required height using two wood screws and and pipe brace.
Turn valve to off position. Turn hot and cold supplies on and
check fitting connections for leaks .
Complete wall construction.
WOOD
SCREWS
WOOD SCREWS
and PIPE BRACE
CROSS BRACE
WALL STUDS
Connect HOT water supply to left VALVE inlet and COLD water
supply to right VALVE inlet. Use pipe sealant or Teflon tape for
all threaded connections. For sweat connections, do not make
sweat connections directly to valve body. Damage to seals and
and valve cartridge may occur. Remove all valve parts before
making sweat connections to valve body.
1
HOT
COLD
16"
Recommended Tools
Flat Blade Screwdriver
Adjustable Wrench
Channel Locks
Pipe Wrench
Teflon Tape
Plumbers' Putty or
Caulking
SINGLE CONTROL WALL MOUNT FAUCET
IN-WALL LAVATORY FITTING
SERIN
™
2-1/8" D.
(54mm)
2" MAX. (51mm) MAX.
1-1/4" O.D.
(32mm) O.D.
HOT
COLD
2" D.
(52mm)
2" MAX.
(50mm)
1" MIN.
(25mm)
FINISHED
WALL
FINISHED
WALL
2" D.
(52mm)
9-1/8"
(233mm)
1/2" NPT
INLETS
4-3/8"
(110mm)
2-1/16"
(52.5mm)
2
(50mm)
TYPICAL INSTALLATION
To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.
Thank you for selecting American-Standard...
the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--
please read these instructions carefully before you begin.