background image

M968918 Rev.1.4

Certified to comply with ASME A112.18.1M
U.S. Patent No. 5,819,789
    

Turn off hot and cold water

supplies before beginning.

CAUTION

Installation

Instructions

2064.461

ROUGHING-IN

DIMENSIONS

1

INSTALL VALVE BODY

Determine where the finished wall location will be. 

This measurement

is very important!  

Note: The rough-in measurement from the finished

wall is; 1" minimum and 2" maximum. This is a 1" tolerance. See

rough-in illustration above.   
Secure FAUCET BODY 

(1)

 to cross brace of wall structure

at required height using two wood screws and and pipe brace.

Turn valve to off position. Turn hot and cold supplies on and

check fitting connections for leaks .

Complete wall construction.

WOOD

SCREWS

WOOD SCREWS

and PIPE BRACE

CROSS BRACE

WALL STUDS

Connect HOT water supply to left VALVE inlet and COLD water

supply to right VALVE inlet. Use pipe sealant or Teflon tape for

all threaded connections. For sweat connections, do not make

sweat connections directly to valve body. Damage to seals and

and valve cartridge may occur. Remove all valve parts before

making sweat connections to valve body.

1

HOT

COLD

16"

Recommended Tools

Flat Blade Screwdriver

Adjustable Wrench

Channel Locks

Pipe Wrench

Teflon Tape

Plumbers' Putty or

Caulking

SINGLE CONTROL WALL MOUNT FAUCET

IN-WALL LAVATORY FITTING

SERIN

2-1/8" D.

(54mm)

2" MAX. (51mm) MAX.

1-1/4" O.D.

(32mm) O.D.

HOT

COLD

2" D.

(52mm)

2" MAX.

(50mm)

1" MIN.

(25mm)

FINISHED

WALL

FINISHED

WALL

2" D.

(52mm)

9-1/8" 

(233mm)

1/2" NPT

INLETS

4-3/8"

(110mm)

2-1/16"

(52.5mm)

2

(50mm)

TYPICAL INSTALLATION

To ensure that your installation proceeds smoothly-please read these instructions carefully before you begin.

Thank you for selecting American-Standard...

the benchmark of fine quality for over 100 years.
To ensure that your installation proceeds smoothly--

please read these instructions carefully before you begin.

Summary of Contents for SERIN 2064.461

Page 1: ...er supply to right VALVE inlet Use pipe sealant or Teflon tape for all threaded connections For sweat connections do not make sweat connections directly to valve body Damage to seals and and valve cartridge may occur Remove all valve parts before making sweat connections to valve body 1 HOT COLD 16 Recommended Tools Flat Blade Screwdriver Adjustable Wrench Channel Locks Pipe Wrench Teflon Tape Plu...

Page 2: ... SCREW 3 Tighten fully Push VALVE STEM 1 down to off position 1 2 5 6 6 11 3 3 Remove PLASTER GUARDS 1 1a from VALVE BODY and SPOUT NIPPLE 2 Apply thread sealant to SPOUT NIPPLE 2 Thread SPOUT MOUNT 3 onto SPOUT NIPPLE 2 using a 10mm Hex Wrench Tighten completely Install SEAL 4 into SPOUT ESCUTCHEON 5 Place SPOUT ESCUTCHEON 5 with SEAL 4 onto SPOUT 6 Fig A Push SPOUT 6 onto SPOUT MOUNT 3 Align SPO...

Page 3: ...f spout drips operate handle several times from OFF to ON and HOT to COLD position Do not force handles turn only 90 Turn off hot and cold water supplies before beginning CAUTION ADJUST HOT LIMIT SAFEYT STOP By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold the HOT LIMIT SAFETY STOP 9 reduces risk of accidental scalding To lower the maximum hot water ...

Page 4: ... SATIN NICKEL 002 295 Replace the YYY with appropriate finish code 2064 461 603275 0070A LOCK NUT 605779 YYY0A VALVE COVER M962514 YYY0A VALVE ESCUTCHEON KIT HOT LINE FOR HELP For toll free information and answers to your questions call 1 800 442 1902 Weekdays 8 00 a m to 6 00 p m EST IN CANADA 1 800 387 0369 TORONTO 1 905 306 1093 Weekdays 8 00 a m to 7 00 p m EST Product names listed herein are ...

Reviews: