3
Fig.3:
Assemble the tube, oil collecting bowl,
filtrating plank and extension funnel.
ASSEMBLY
Fig.1:
Assemble the handle(B) and insert the
probe assembly, close the ball valve(H).
Fig.2:
Assemble the vacuum gauge(D) and close
the ball valve(J).
A
B
H
(close)
C
Fig.4:
Insert the assembly into the reservoir,
then turn the handwheel(O) clockwise direction
and tighten.
O
D
J(close)