18
STEP 8: LANDING KIT
Each landing shall be equipped with :
Acess door
Interlock
Hall station
Acess door shall be install as per project drawing
Acess door are provided with interlock
Route wire down to controler in the wireway
LANDING KIT
TERMINAL
1St landing
1
2nd landing
3
3rd landing
5
4th landing
7
1
CONTROLER
2
3
4
5
6
7
8
9
10
11
12