41
98-0157 Rev P
6.4.1
RO Supply Screen
Single Pass Screen
Dual Pass Screen
Figure 39
Figure 40
AUTO RINSE MIN defines the duration of initial rinse. If unit has not rinsed to quality set-point,
system will rinse for an additional minute until max time has been reached. If unit has not reached
the quality after max time elapsed an alarm is logged.
AUTO FLUSH defines the duration of flush.
TARGET RECOVERY RO1 sets target water recovery of stage 1 RO modules.
TARGET RECOVERY RO2 sets target water recovery of stage 2 RO modules.
SUPPLY HEATING defines whether the tank heater is to be used to warm the incoming water supply.
When enabled, the heater is turned on at 48°F (9 °C) and off at 52°F (11°C).
ENTER under SUPPLY TIME SCHEDULE opens to the screen shown below and enables automatic
operating times to be set. System operation is activated when TIMER is selected in the OPERATION
MENU screen.
Summary of Contents for 00MDP2-230
Page 2: ......
Page 61: ...59 98 0157 Rev P 9 2 1 MSP Spare Parts ...
Page 62: ...60 98 0157 Rev P ...
Page 63: ...61 98 0157 Rev P 9 2 2 MDP Spare Parts ...
Page 64: ...62 98 0157 Rev P ...
Page 66: ...64 98 0157 Rev P FLOW DIAGRAMS MSP UNITS ...
Page 67: ...65 98 0157 Rev P MDP UNITS ...
Page 68: ...66 98 0157 Rev P WIRING SCHEMATIC MSP UNITS ...
Page 69: ...67 98 0157 Rev P ...
Page 70: ...68 98 0157 Rev P ...
Page 71: ...69 98 0157 Rev P ...
Page 72: ...70 98 0157 Rev P ...
Page 73: ...71 98 0157 Rev P ...
Page 74: ...72 98 0157 Rev P ...
Page 75: ...73 98 0157 Rev P ...
Page 76: ...74 98 0157 Rev P MDP Units ...
Page 77: ...75 98 0157 Rev P ...
Page 78: ...76 98 0157 Rev P ...
Page 79: ...77 98 0157 Rev P ...
Page 80: ...78 98 0157 Rev P ...
Page 81: ...79 98 0157 Rev P FX3U 4AD ADP ...
Page 82: ...80 98 0157 Rev P ...
Page 83: ...81 98 0157 Rev P ...
Page 86: ...84 98 0157 Rev P ...
Page 87: ...85 98 0157 Rev P MDP Units ...
Page 88: ...86 98 0157 Rev P ...